Pop-up electric vehicle charge points
The UEone pop-up charge point from Urban Electric was used in the Oxford trial. (Photo: PRNewsfoto/Urban Electric). |
Electric vehicles (EVs) reduce a driver's environmental footprint in a number of ways, including reducing pollution and conserving non-renewable fuel resources. However, they require a little forward thinking to ensure that the EV has the power it needs. From refuelling to pricing, electric car charging stations are crucial.
In August 2017, London boroughs received funding to provide residential charge points to assist those who did not have access to off-street parking. This funding supported a number of innovative new approaches such as using lamp posts as the base and power supply for charge points.
Another innovative approach is the pop-up charging station. These pop-up systems provide curbside charging for EV drivers who park on the street in residential zones and may not have access to reserved charging stations.
Pop-up chargers are designed to be flush with the pavement, so they do not interfere with walkways or create trip hazards. Until it is activated by a user, the charging portion of the device is hidden underground.
This approach to EV charging has been tested in two parts of the country:
- In Oxford, a trial through Urban Electric saw the installation of app-operated UEone prototype devices around the city. The trial was co-funded by Innovate UK in partnership with Duku and Oxford City Council. This programme was completed in April 2020.
- Another prototype funded by Innovate UK is the flat, flush Trojan Energy charging system. The initial phase began as a small trial in July 2021; over time, 150 pop-up charge points will be installed across the London boroughs of Brent and Camden.
[edit] Related articles on Designing Buildings
- ECA and UKPN launch EV guide.
- Electric car charging stations - what you need to know.
- Electric vehicle future.
- Electric vehicles.
- Electric vehicles in 2021.
- London car charging infrastructure.
- New style EV charging stations.
- Opportunities for EV charging.
- Two thirds of local authorities have no plans to install EV chargers.
[edit] External resources
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.